In accordance with the "Measures for Public Participation in Environmental Impact Assessment" (Order No. 4 of the Ministry of Ecology and Environment), the first public announcement of environmental impact assessment information for the product transformation project of Netscher New Materials (Yingkou) Co., Ltd. is hereby made.
I. Project Name and Summary
Project Name: Product Transformation Project of Netzer New Materials (Yingkou) Co., LTD
Construction nature: Renovation
Construction Location: No. 139, South Binhai Road, Yingkou City, Yingkou Area, China (Liaoning) Pilot Free Trade Zone, Yingkou City, Liaoning Province
Construction content: Utilizing the existing factory building with an area of 3,000 square meters, the safety, environmental protection and energy conservation levels will be enhanced. The production line with an annual output of 5,000 tons of titanium tetrachloride will be transformed and converted to produce 5,000 tons of zirconium tetrachloride products annually. Three sets of zirconium tetrachloride production lines will be built, and production equipment such as graphite heating elements, fiberglass reinforced plastic shells, chlorination furnace bottoms, transition sections, expansion sections, medium-frequency heating devices, screw feeders, double-screw heating mixers, zirconium tetrachloride dust collectors, zirconium tetrachloride condensers, screw dischargers, and helical ribbon mixers will be purchased.
Ii. Construction Entity
Construction entity: Netzer New Materials (Yingkou) Co., LTD
Address: No. 139, South Binhai Road, Yingkou City, Yingkou Area, China (Liaoning) Pilot Free Trade Zone, Yingkou City, Liaoning Province
Contact Person: Guan Xuebo Contact Number: 18840735512
Iii. Environmental Impact Report Preparation Units
The environmental impact assessment report was prepared by Liaoning Sanhui Technology Co., LTD
4. Solicit public attitudes, opinions, demands and suggestions on strengthening environmental protection regarding the implementation of the project.
V. Within 10 working days from the date of the announcement, the public can contact the construction unit by email to submit the public participation opinion form or put forward relevant opinions and suggestions by phone.
The public network sheet link: http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html
The way and channel to submit the public opinion form: 947681301@qq.com
Netzer New Materials (Yingkou) Co., LTD